Work continues

| No Comments

Making the best of my day off, I've cleaned up most rubbish on the building site and truth be said, it looks much better now. I've also requested pickup for the big bag filled with another 1.5 ton of construction waste, and with that out of the way, I think I'll pick up another empty bag for the rest of the work that needs to be done, which would then bring the total weight moved out in waste and rubbish to 4.5 tons. Rather impressive, ain't it?

I don't even dare think how much material I've bought and used so far, let alone what I'll need over the coming months, grin.

Next on the (still long) list : install floor and heating, build supports for the bathtub and raise shower wall, wire the complete bathroom, install drains and water and probably a ton of other things.

Leave a comment

Monthly Archives

Pages

OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.2.3

About this Entry

This page contains a single entry by ServMe published on May 1, 2013 4:39 PM.

Everyone knows who you are was the previous entry in this blog.

Weekend @Lommel is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.